2 APRIL 2019
Today a team from WYG have been installing tens of tubes to monitor the air around the school’s grounds. They’ve also installed two AQ Mesh Metres (one inside the school and one in the playground). They will collect their gear back in about 2 weeks to study the data they’ve been gsthering during this period.




